Project Details Another hurdle to over come was the proximity of the Detroit People Mover and Sub-station to the excavation site. This required the submittal of a detailed construction and protection plan of existing structures prior to commencing of construction and excavation. Additionally, NADC provided 24,000 tons of aggregate backfill over 40,000 square feet of geotextile fabric. NADC also built and maintained temporary site access roads, access ramps, lay down areas and parking areas including periodic grading, as well as the removal of all caisson spoils and ramps. This project was completed on schedule, with limited change orders and without interference with the simultaneous steel work and ongoing building construction. Contact us for more detailed information on your project. |
|
|
|||||||||||||||||||||||||||
|