NADC Completed Demolition Projects
North American Dismantling Corp. is proud to present a cross section
of our completed projects showing a variety of demolition services.
If you have questions or would like to discuss your project, please
contact or sales department at 800-664-3697.
 |
 |
PacifiCorp
Energy Electrostatic Percipitator Conversion
NADC worked these twin projects to help facilitate the conversion
process at both the Huntington Unit #1 and Hunter Power Plant
#2 for PacifiCorp. >> More
details |
 |
 |
Bayer
New Martinsville Plant
North American Dismantling surgically removed specified buildings/units
at the Bayer New Martinsville Plant while working in close proximity
of other Major Chemical Units that were to REMAIN intact. >>
More details |
 |
 |
Consumers
Energy - Units No. 1 and No. 2 Percipitator Removal
This project consisted of removing Units 1 & 2 Primary and
Secondary Precipitators, ID Fans and all inlet/outlet ductwork
located at the D.E. Karn Plant, 2742 N. Weadock Hwy in Essexville,
Michigan. >> More
details |
 |
 |
GM
Guide Manufacturing Facility
This project consisted of the purchase, environmental decommissioning
and dismantling of the approximately 2,300,000 square feet of
the existing GM manufacturing facility located in Anderson,
Indiana. >> More
details |
 |
 |
Fraser
Pulp Mill
The project in Berlin, New Hampshire consists of the dismantling
of an existing paper pulp mill composed of 85 separate structures
totaling 600,000 square feet located over 120 acres. >>
More
details |
 |
 |
Major
Pharmaceutical
This project was a design/build project located in Southwest,
Michigan. The original contract was for $10.2 million and consisted
of four elements including Design Engineering, Demolition, Asbestos
Abatement and New Construction. >> More
details |
 |
 |
Compuware
Headquarters
This project consisted of the removal of approximately 400,000
cubic yards of earthwork soils and site clearing.
>> More
details |
 |
 |
Tornado
Recovery - GM Assembly Plant, Oklahoma City
On Thursday May 8, 2003 at approximately 5:30 pm, a tornado
touched down at the General Motors Oklahoma City Assembly Plant
in Oklahoma City creating extensive damage to the Paint Shop,
Body Shop, Powerhouse and completely destroying 2 cooling towers.
>> More
details |
 |
 |
Northwest
Airlines Terminal Design-Demolish-Build
North American Dismantling was contracted by Northwest Airlines
as General Contractor to design, demolish and build structures
known as Concourses C, D, E, F, and G at Detroit Metropolitan
Wayne County Airport. >> More
details |
 |
 |
East
Kentucky Power Plant
This project is a classic sample of the selective demolition
of a precipitator located between two structures. >>
See
photos |
 |
 |
Froedert
Malt Plant
North American Dismantling was contracted by the Miller Park
Way Limited Partnership to provide environmental remediation
and dismantle the Old Froedert Malt Plant in Milwaukee, Wisconsin.
>> More
details |
 |
 |
EXCEL
Energy Demolition & Asbestos Abatement of the East Texas
Plant
Demolition and Asbestos Abatement of the East Plant totalling
approximately 200,000 sq.ft. This project consisted of the demolition
of all structures on site with only the concrete foundations
to be left in place. >> More
details |
 |
Other Projects of Interest
GM
Truck Group and Assembly Plant Body Shops
Demolition of various Body Shops, including facilities at: Fort
Wayne, IN; Janesville, WI; Arlington, TX; and Lake Orion and Detroit
Hamtramck, MI >> More
details
GM
Process Equipment Demolition Paint Shop Spray Booth and Ovens
Strip Out and Demolition of Paint Shops and Process Equipment, including
facilities at:
Warren, MI and Moraine, OH >> More
details
GM
Engine Plant and Powerhouse Decommissioning & Demolition
Total demolition of a 20,000 sf Powerhouse and the strip out of
148,000 sf Engine Assembly Plant at the GM Tonawanda Engine Assembly
Plant. >> More
details
Mopar
Parts Distribution Centers
Strip out of various types of Carousel Systems at several Mopar
Parts Distribution Centers throughout North America. >> More
details
NASA
- Dismantling of Mobile Launch Tower No. 3
After being awarded the contract to demolish Mobil Launch Tower
# 3 for NASA at the Kennedy Space Center. >> More
details
14
Story Steel Structure Implosion & Demolition
On January 19, 1997, North American Dismantling Corporation imploded
a 160,000 square foot 14 story steel structure in downtown Detroit.
>> More
details
MacKenzie
Hall Implosion & Demolition
To minimize the exposure to the student population and other surrounding
facilities, the implosion of the building was essential. >>
More details
Contact us for more detailed
information on your project.
Heavy
Industrial | Demolition
Contractors
|