Compuware Headquarters
Site Clearing & Earthwork
Owner: Compuware Corporation
Location: Detroit, Michigan
Details
The Compuware project consisted of the removal of approximately 400,000 cubic
yards of earthwork soils and site clearing which included the demolition,
excavation and removal of approximately 16,000 cubic yards of existing
reinforced concrete, including foundation walls, footings, grade
beam, columns, slabs and other buried debris.
Site excavation was to the face of soldier piles in an earth retention
system. Site demolition also included the removal of an abandoned
Detroit Edison steam tunnel that included asbestos abatement procedures.
In addition to the excavation of existing materials NADC was responsible
for continual site dewatering and soil erosion control, dust control
and the installation of new fire hydrants on the site.
Another hurdle to over come was the proximity of the Detroit People
Mover and Sub-station to the excavation site. This required the
submittal of a detailed construction and protection plan of existing
structures prior to commencing of construction and excavation.
Additionally, NADC provided 24,000 tons of aggregate backfill over
40,000 square feet of geotextile fabric. NADC also built and maintained
temporary site access roads, access ramps, lay down areas and parking
areas including periodic grading, as well as the removal of all
caisson spoils and ramps.
This project was completed on schedule, with limited change orders
and without interference with the simultaneous steel work and ongoing
building construction.