In a third of kind project, General Motors contracted North American
Dismantling through its construction managers, National Industrial
Services, Inc. to complete the demolition of approximately 4,000,000
sf of existing body shop and salvaging $800,000 worth of equipment
that had been previously sold in negotiated sales.
NADC completed two similar projects for NISI and GM in a year and
a half period. The first being the demolition of the 400 GMT Body
Shop in Ft. Wayne, Indiana; the second being the demolition and
dismantling of the 400 GMT Body Shop in Janesville, Wisconsin. Again,
NADC was responsible for all mechanical and electrical disconnects,
environmental cleaning and rigging, loading and scheduling transportation
of the salvaged equipment.
Although General Motors had scheduled this project for a four-week
period, NADC completed its work in fifteen calendar days without
any additional cost to the owner. This fast tracked schedule allowed
the owner to accelerate its schedule for the installation of its
new facilities.
Also included in North American Dismantling's scope-of-work was
the backfilling and concrete replacement in the pit areas created
as a result of the demolition activities. As with the previous two
projects, this project was completed ahead of the proposed schedule
with limited change orders and without interference to plant production.